Flow Rates news and technical articles from Oil & Gas Financial Journal. Search Flow Rates latest and archived news and articles
Dallas-based oil and gas company Cubic Energy has announced results of three horizontal Haynesville Shale wells in Northwest Louisiana.
testing flowing oil at a rate of 835 bpd from the Abu Roash "E" target zone. As this is an oil discovery with commercial flow rates , the operator, Kuwait Energy PLC, anticipates commercial production of the Al Jahraa-1 discovery as soon as all
R section of the Lower Miocene with good porosity. Flow testing will be required to confirm the ultimate hydrocarbon flow rates from the zone, which was full to base. McMoRan controls approximately 15,000 gross acres in the immediate area of
condensate per day and 30 million cubic feet of natural gas per day. A drill stem test at the Tweneboa-2 well achieved flow rates of 6,500 barrels of oil per day and 5 million cubic feet of natural gas per day. The data from these tests is being
stimulation fractures and aid in growing the complexity of the fracture treatment. This should have a positive impact on flow rates . X-ray diffraction (XRD) analysis has shown little presence in samples of clay minerals often associated with sensitivity
through indirect sensor measurements, determining a reasonable estimate of oil, natural gas, and/or saltwater flow rates through the conduit. Such an estimate would be invaluable in dealing with an uncontrolled flow event in ultra-deepwater
condensate per day and 30 million cubic feet of natural gas per day. A drill stem test at the Tweneboa-2 well achieved flow rates of 6,500 barrels of oil per day and 5 million cubic feet of natural gas per day. The data from these tests is being
has started production at its Balboa Field, located on East Breaks Block 597 in the Gulf of Mexico. Initial gross flow rates have stabilized at approximately 30 million cubic feet of natural gas and 1,400 barrels of oil per day. Apache's
cutting and removal of the riser pipe from the top of the BOP's lower marine riser package (LMRP). While oil and gas flow rates are expected to take a few days to stabilize, and BP says it “is not possible” to estimate how much oil and gas will
July 2010. Yixin-2 is being drilled as a twin well of Yixin-1, a well drilled by Sunwing in 2007 that generated flow rates of up to 4.0 million cubic feet per day before being shut down due to certain equipment failures during the testing